Goals

Date

at 10PM (via ZOOM)

Attendees



Agenda

  1. Review of action-items and open issues (by each team: TDS, LFR, THR, ROC, DAS)
  2. Planning
  3. Next meeting
  4. AOB

Discussion items

ItemNotesAction-Items
1.
  • Requirements and scope (introduction)
    • See slide 3 in RPW_FSW_Upgrade_Support_20201130_V01.pdf attached below
  • MOC needs and recommendation
    • See slide 4 in RPW_FSW_Upgrade_Support_20201130_V01.pdf attached below
  • DAS FSW needs and resources
    • No need to update DAS
    • LESIA DAS team will retrieve the FSW patch images from analyser teams, perform usual verifications (image size, consistency w.r.t. to budget, memory resource on EEPROMs) and provide to the ROC the FSW patch commands as TcScript files.
    • It is important the analyzer teams check memory footprint (shall remain in the budget)
  • TDS FSW needs and resources
    • See td_software_plans.pdf attached below
    • 2-3 months of work
    • No need specific funding or external human resource
    • Leads by Jan and Ludek
    • No need to update TM/TC
  • LFR FSW needs and resources
    • See LFR FSW upgrade_30 november 2020.pdf attached below
    • At least 6 montshs of work
    • No need specific funding or external human resource, except maybe for quality support. CNES may supply software quality support (Charles Dixon will be in charge of the software quality assurance from CNES in 2021)
    • Leads by Thomas and Bruno (with Alexis and Veronique in the loop)
    • No need to update TM/TC, but might require to change descriptions in the ICD (not a problem for Philippe → will no impact IDB structure)
    • May need to inject stimuli during validation tests on GSE at LESIA
  • THR FSW needs and resources
    • See THR_FS_Upgrade_30112020.pdf attached below
    • At least 3 months of work
    • Need funding for THR FSW upgrade cause K.Boughedada left the team (and quality support? → Check if possible with W.Recard from NEXEYA). Funding from LESIA RPW?
    • Leads by Milan, Pierre-Luc, Antonio and Moustapha
  • ROC needs and resources
    • No need extra funding or resources
    • Leads by Xavier and Diane
    • Will coordinate the activity (main contact with the MOC/SOC)
    • Will perform validation tests on GSE at LESIA and prepare the PDOR/MDOR for the MOC (Patching + SFT)
    • Prepare FSW patch plan and report
  • Desi - Check if CNES can supply support for FSW quality
  • Xavier - Check with Philippe about quality support at LESIA for THR FSW upgrade
  • THR Team - To supply to the Xavier the detailed needs (human and funding) for the FSW upgrading
2.
  • See slide 5 in RPW_FSW_Upgrade_Support_20201130_V01.pdf attached below
  • Validation test will be performed by the ROC with the support of the teams on the GSE at LESIA
  • LFR team - To confirm the need of stimuli for validation tests on the GSE and provide, if needed, the stimuli files
  • ROC (Xavier and Diane) - Check if stimuli can be injected in the EM2 with the GSE at LESIA
  • ROC (Xavier and Diane) - Check with Sylvian Lodiot and/or Julian Braun about verification/validation steps at MOC level (only MDOR/PDOR consistencies?)
3.
  • ROC - To inform the MOC/SOC about preliminary schedules and the possibility to perform the patches around the planned dates
4.
  • Add Alexis Jeandet and Bruno Katra in the working group mails

Action items

Attached items