Goals

Date

at 10PM (via ZOOM)

Attendees


Agenda

  1. Review of action-items and open issues (by each team: TDS, LFR, THR, ROC, DAS)
  2. Planning
  3. Next meeting
  4. AOB

Discussion items

ItemNotesAction-Items
1.
  • ROC
    • See slides from Diane (pdf)
    • Switch back to EEPROM1 (in case of problem) must be done one week before E-GAM. We have about one month to check the good behavior of the patches on EEPROM2
    • Datapack
      • TDS FSW UM needs updates → update before Sept. 24
      • Send a first version of the datapack to TDS/THR/DAS/CNES teams for review before delivering (send a copy to FSW team at CNES → Benoit Fresoul)
  •  LFR
    • All bugs have been fixed (ASM, CPU)
    • Not big change in algo
    • S/W load slightly higher (few %)
    • S/W size will be estimated (may be slightly bigger)
    • Start test phase
    • Should be able to deliver a datapack to LESIA and CNES around mid-decembre
    • What about static analysis? To be discussed with Charles
    • What about coverage analysis? Heavy and long process. Running tests only could be enough. (Last coverage report indicated 90% for lines coverage and 85% for branch coverage. Quite above requirements)
    • No IDB impact → To be formally confirmed with Philippe and LeeRoy
  • Xavier to generate and share CDF L1/HK for SFT on EM2
  • Diane to write a  "RPW FSW patching report" detailling the tests results - To be joined with teams' documents to the datapack delivered to ESA
  • Diane to write operation activity plan (in preparation to on-board patching)
  • Diane and Xavier to create PDOR/MDOR
  • ROC to prepare the datapack (send a preliminary version to teams for review)
2.
  • Operation activities (timeline, roles and validation) must be refined with MOC. Especially, it must be discussed about the presence of RPW people at MOC during the operation.
  • LFR team to refine the date of delivery for its patch in 2022 - End of 2021
3.
  • Next meeting planned on Novembre 15 at 10AM (CET) to  with teams

4.



Attached items