Summary

Preparation of the E2E-1 test data package for RPW:

  • E2E-1 test-related RPW flight procedures to be delivered at MOC before .
  • Draft of related RPW STP IORs to be delivered at SOC before  (TBC)
  • Final related RPW STP IORs to be delivered at SOC on (TBC)
  • SOC will send test specification on February 2019 (TBC).
  • MEB PFM IDB TBD will be used during test.
  • The E2E-1 test is planned to be run on April 2019 at SOC (TBC).
  • The E2E-1 test report will be published on May 2019 by SOC (TBC)
  • Presence of people from RPW at ESAC is not required (TBC)

Details about the E2E-1 test plan and specification can be found on the SOC public page (see https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOC+System+Test+Specifications). The baseline for the test is the SOWG13 LTP planning exercise ( https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOWG+13+LTP+planning%3A+Context+and+Preparations).

E2E-1 test input data files sent by SOC are available here:

Main points of contact are:

  • Sylvain Lodiot at MOC (for RPW procedures submission)
  • Chris Watson at SOC (for IOR)
  • Andrew Walsh at SOC (for LTP planning exercice and E2E-1 datapackage submission)
  • Fernando Martin Porqueras at SOC (for test manager) (TBC)

Main features of the data package

  1. Release of the set of flight procedures/sequences to run the E2E-1 related IOR.
  2. Release of the STP IORs as expected by SOC (see E2E-0 test plan).

Description of the data package

  • Set of STP IORs for the E2E-1 test
  • Associated procedures/sequences (already delivered in the RPW SVT1 datapack)
  • README.rst with a description of the content
  • CHANGELOG.rst, with a history of modifications

The data package must be released as a zip file, named as: RPW_E2E-1_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.

Additionally, the ROC shall deliver the set of STP IOR files, as specified in the E2E-1 test plan.

Status of the data package 

Sequences status

The sequences required to run the E2E-1 test are delivered to the MOC in the RPW SVT1 data package.

See RPW SVT1-A DATAPACK RELEASE for a complete list of the sequences status.

Deliverable status

It is planned to deliver the IOR XML files for TBD identified STP-cycles of the SOWG13 LTP planning exercice.

ContentStatusComment
Set of draft RPW STP IORs for the E2E-1 test

Delivered to SOC on TBD


To be checked before deliverying:

  • Do the IORs cover the expected STP time range?
  • Do the IORs are consistent with the expected RPW Observations timeline (see SOWG13 LTP planning exercice timeline in SOOPKitchen)?
  • Do the IORs are in agreement with the TMC constraints?
  • Do the IORs are valid according to the IDB?
  • Do the IORs are valid according to the IOR ICD issue X.Y?
  • Do the IOR group file is valid according to the SOC-IT interface ICD issue X.Y?
  • Do the ROC-SOC GFTS node is up-and-running?
Set of final RPW STP IORs for the E2E-1 testDone on TBD

Related Documents

Expected documentation

N/A