Goals
Date
at 10PM (via ZOOM)
Attendees
Agenda
- Review of action-items and open issues (by each team: TDS, LFR, THR, ROC, DAS)
- Planning
- Next meeting
- AOB
Discussion items
Item | Notes | Action-Items |
---|
1. | - LFR
- ASM bug has been solved, but S/W crashes (new computation in S/W seems to be too heavy for CPU load. Work is still in progress
- QAP support:
- Required support needs to be refine with help of the CNES, as well as budget
- May be approx. 5-6 days of NEXEYA support
- Joined effort with LESIA is probably not needed, since the degrees of quality support should be not the same (less for LESIA)
- TDS
- A new version of the TDS software will delivered
- TDS should be OK to deliver a FSW image before mid-July 2021
- Upgrades seem to be OK (need verifications)
- Not important changes, increases by few bytes the software size
- LeeRoy thinks it will be OK to deliver corresponding C-SGSE scripts to ROC by the end of August.
- THR
- FSW upgrades
- Science algorithm of new THR FSW has been tested by Pierre-Luc
- FSW tests
- C-SGSE scripts RPWDPU-1984_Load_EEPROM1_RpwThrApp_V3_6_1_0 and RPWDPU-1984_Load_EEPROM2_RpwThrApp_V3_6_1_0 available on RPW-AIT2AI
- Scripts to be run by ROC
- Kamel will be at LESIA from July 5 to 9 to test and finalize the THR patch. It can be good that both ROC and DAS teams are available if required.
- ROC will try to see with Simone Thjis if it is possible to test the execution of the C-SGSE scripts before the Kamel's arrival (TBC)
- New TNR tests on EM2 perfomed by ROC at LESIA. Data sent to Antonio
- QAP support
- Light support needed for LESIA.
- THR team will see with CNES about quantifying support from NEXEYA and the impact on the FSW upgrade on documentation.
- Planned a discussion about documentation between THR team and Charles Dixon, if possible, during the week when Kamel is at Meudon.
- Documentation:
- Kamel might write the documentation
- What about THR test plan ? See with ESA (if all tests in plan are not run, it shall be justified)
- If everything is OK, new THR FSW image might be delivered before mid-July
- ROC
- Will support THR team for the tests run when Kamel will be here
- Still need to write formal plan in preparation to in-flight patching operation
- MOC/SOC will have to be informed if current planning is changed
- Main activities are still planned on Sept/October (retrieve C-SGSE scripts, test on EM2 and convert into MDOR/PDOR)
| - THR team to think about who will update the documentation related to FSW patching
- ROC (Xavier/Diane) to write a first "RPW FSW patching plan" detailling the needs, actors and planning - Before next telecon
- Xavier to see if joint effort is possible about QAP support for LPP and LESIA
- LeeRoy: To check availability during July 5 to 9 (in case of C-SGSE script re-delivery)
- ROC to run with the help of Simone the THR C-SGSE scripts on EM2
|
2. | - TDS/THR FSW images delivered on mid-July 2021 to DAS team
- DAS team to deliver to ROC C-SGSE scripts (deadline mid-september 2021)
| - LFR team to refine the date of delivery for its patch in 2022 - End of 2021
|
3. | - Next meeting planned on September 14 at 10AM (CEST)
|
|
4. | | |
Attached items