Summary
Preparation of the E2E-1 test data package for RPW:
- E2E-1 test-related RPW flight procedures to be delivered at MOC before .
- Draft of related RPW STP IORs to be delivered at SOC before (TBC)
- Final related RPW STP IORs to be delivered at SOC on (TBC)
- SOC will send test specification on February 2019 (TBC).
- MEB PFM IDB TBD will be used during test.
- The E2E-1 test is planned to be run on April 2019 at SOC (TBC).
- The E2E-1 test report will be published on May 2019 by SOC (TBC)
- Presence of people from RPW at ESAC is not required (TBC)
Details about the E2E-1 test plan and specification can be found on the SOC public page (see https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOC+System+Test+Specifications). The baseline for the test is the SOWG13 LTP planning exercise ( https://issues.cosmos.esa.int/solarorbiterwiki/display/SOSP/SOWG+13+LTP+planning%3A+Context+and+Preparations).
E2E-1 test input data files sent by SOC are available here:
Main points of contact are:
- Sylvain Lodiot at MOC (for RPW procedures submission)
- Chris Watson at SOC (for IOR)
- Andrew Walsh at SOC (for LTP planning exercice and E2E-1 datapackage submission)
Main features of the data package
- Release of the set of flight procedures/sequences to run the E2E-1 related IOR.
- Release of the STP IORs as expected by SOC (see E2E-0 test plan).
Description of the data package
- Set of STP IORs for the E2E-1 test
- Associated procedures/sequences (already delivered in the RPW SVT1 datapack)
- README.rst with a description of the content
- CHANGELOG.rst, with a history of modifications
The data package must be released as a zip file, named as: RPW_E2E-1_DATAPACK_IssueXX_RevYY.zip, where XX and YY are the issue and revision of the data pack.
Additionally, the ROC shall deliver the set of STP IOR files, as specified in the E2E-1 test plan.
Status of the data package
Sequences status
The sequences required to run the E2E-1 test are delivered to the MOC in the RPW SVT1 data package.
See RPW SVT1-A DATAPACK RELEASE for a complete list of the sequences status.
Deliverable status
It is planned to deliver the IOR XML files for TBD identified STP-cycles of the SOWG13 LTP planning exercice.
Content | Status | Comment |
---|---|---|
Set of draft RPW STP IORs for the E2E-1 test | Delivered to SOC on TBD | To be checked before deliverying:
|
Set of final RPW STP IORs for the E2E-1 test | Done on TBD |
Related Documents
Expected documentation
Related-release testing & validation
Related-release open questions
N/A
Release-related JIRA issues